PENERAPAN FAULT TREE ANALYSIS (FTA) TERHADAP FAKTOR KETERLAMBATAN PENYELESAIAN PROYEK RENOVASI INTERIOR

Authors

  • Fian Azis Denata Management, Faculty of Economics and Business, Brawijaya University, Indonesia
  • Astrid Puspaningrum Faculty of Economics and Business, Brawijaya University, Indonesia

DOI:

https://doi.org/10.21776/jki.2023.02.2.24

Keywords:

Project Delay, Interior Renovation, Fault Tree Analysis, FTA

Abstract

PT Prima Daya Nugraha is a contractor specialized in mechanical, Electrical & HVAC, established in 2013. The satisfaction of partners and customers is its business strategy for growth and development. As the company progresses, it opened a new business area in 2022, i.e., interior project. The company has taken an interior job and renovation project for Matahari Department Store Festival Citylink in Bandung and Matahari Department Store Uptown in Semarang. The object of this qualitative descriptive research is the interior renovation project of Matahari Department Store Festival Citylink in Bandung. The completion of this project was delayed, but the contractor company faced difficulties in analyzing factors that had caused the delay. Therefore, fault Tree Analysis (FTA), a qualitative analytical tool, is needed. The analysis was conducted in stages of identifying problems that had caused the delay, making the fault tree construct diagrams along with the logic gate from the basic event to the top event. The stages have enabled the analysis on factors causing the delay, the identification of fault event combination, i.e., the minimal cut set, that had led to the occurrence of the top event, the qualitative fault tree analysis using the Boolean algebra to acquire the minimal cut set, and the identification of events causing the top event.

References

Ansori. (2013). Integreted Maintenance System. Yogyakarta: Graha Ilmu.

Assaf & Al-Hejji. (1995). Construction Project Scheduling. New York: McGrawHill.

Ching, F. (2008). Arsitektur (Bentuk, Ruang, dan Tatanan). Jakarta: Erlangga.

Hafnidar, Rani. (2016). Manajemen Proyek Konstruksi. Yogyakarta: Budi Utama.

Lewis & Atherley. (1996). Delay Construction. Langford: Cahner Books International.

Martono, R. V. (2018). Manajemen Operasi Konsep dan Aplikasi. Jakarta: Salemba Empat.

Narbuko. (2015). Metode Penelitian. Jakarta: Bumi Aksara.

Priyanta, D. (2000). Keandala Dan Perawatan. Surabaya: Institut Teknologi Sepuluh November .

Sugiyono. (2018). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.

Widjanarka. (2006). Teknik Digital. Jakarta: Erlangga.

Downloads

Published

2023-07-04

Issue

Section

Articles

How to Cite

PENERAPAN FAULT TREE ANALYSIS (FTA) TERHADAP FAKTOR KETERLAMBATAN PENYELESAIAN PROYEK RENOVASI INTERIOR . (2023). Jurnal Kewirausahaan Dan Inovasi, 2(2), 603-618. https://doi.org/10.21776/jki.2023.02.2.24